|
|
|
|
Very Important
- the right informaiton are general and infomal guidelines
for the installation of stone. It is necessary to verify
proper installation methodes according to particular projects
with the stone supplier, Adhesive manufactoerer and installer.
Stone Victory Factory is not responsible for any comission
or misunderstanding of these guidelines. |
|
|
|
|
|
|
|
When slabs are going to be
stocked at the job site, the following precautions should
be taken: |
|
|
|
|
|
Slabs should be placed away from the job
traffic area. |
|
|
The polished sides should be facing each
other. |
|
|
Slabs should be resting vertically. |
|
|
If it is necessary to stack them, the slabs
should be separated by a 1"x4" piece of wood.
|
|
|
|
|
|
|
|
|
|
|
|